Water quality, plume modelling and tracking before and during dredging in Mermaid Sound, Dampier W.A.
OxygèneCarbone inorganiqueMatière particulaireTempérature de surfaceComposition et couverture des coraux durs
A water quality monitoring program established to coincide with the Mermaid Sound dredging projects in 2004 for assessed turbidity, suspended sediments and other parameters (Dissolved Oxygen, pH, Temperature, Salinity) every three days to start then weekly.
To assist in locating monitoring sites - a model of sediment transport was developed. Also throughout the dredging program aerial surveys of the dredging location, monitoring locations and surrounding areas were undertaken on a weekly basis. They were flown of the same day as the water monitoring trip to allow for cross-referencing of visual observations and actual data.
Données et ressources
Informations supplémentaires
| Étendue temporelle | 2004-01-06 – 2004-05-24 |
|---|---|
| Date (creation) | 2007-07-02 |
| Statut | completed |
| Fréquence de mise à jour | notPlanned |
| Langue des métadonnées | en |
| Licence | Creative Commons Attribution 4.0 |
| Métadonnées sources | ISO 19115 XML |
| Dernière mise à jour | 2026-11-05 |
| Créé | 2026-11-05 |
| API | package_show |